Annual Street Resurfacing

Project ID: 
TS-01001, TS-01004, TS-01009, TS-01003, TS-01005, TS-01006, TS-01008, TS-01060, TS-01052, TS-01007, and TS-01022
Project Category: 
Streets and Roadways
Project Status: 
In Construction
Project Priority: 
Asset Preservation
Project Lead: 
Special Projects Manager
Year Adopted:
Annual Project
Target Completion Date:
Will Be Updated Soon

The annual street resurfacing and City alley resurfacing project place an asphalt concrete (AC) overlay on existing street surfaces that are approaching the end of their useful life, as evidenced by cracking and minor pavement failures. Cutouts and repairs of pavement failures, and grinding down the pavement at outer edges and/or curbs may be included. Installation of pavement fabric in addition to pavement striping and stenciling after the resurfacing, repair of damaged sidewalks, ADA ramps, curb and gutter, and minor drainage improvements are also included in this project.

Streets are selected for resurfacing in coordination with a Pavement Management Program (PMP) that provides a City-wide ranking of the condition of all the streets maintained by the City. The actual number of streets resurfaced is dependent upon both the condition of the streets and the bidding climate. 

The 2022 Annual Street Resurfacing and City Alley Resurfacing Project is currently in the construction phase.

Community Impact
More detail on the project schedule will be uploaded soon; please see the "Files" section at the bottom of this page. On the day work is performed, it may be necessary to temporarily close street segments to all traffic between 8 AM to 5 PM Temporary barricades will be placed as necessary 48 hours prior to the start of work. The closed streets will be opened as soon as possible to minimize inconvenience to residents and commuters. All streets will be open by 5:30 PM daily. Please also note that closures do not apply to emergency vehicles such as ambulances or fire trucks.

Questions about the project can be directed to the city of Los Altos, Department of Public Works, Engineering Division at (650) 947-2780. 

Project Estimates Prior
Appropriations
2019/20 Budget 2020/21 Planned 2021/22 Planned 2022/23 Planned 2023/24 Planned Total
Street Resurfacing $4,270,253 $1,650,000 $1,650,000 $1,650,000 $1,650,000 $1,650,000 $12,520,253
Funding Sources
CIP $2,020,253 $250,000 $250,000 $250,000 $250,000 $250,000 $3,270,253
Gas Tax $700,000 $350,000 $350,000 $350,000 $350,000 $350,000 $2,450,000
Road Maint. & Acct. Act  $450,000 $550,000 $500,000 $500,000 $500,000 $500,000 $2,950,000
Measure B  - 0 - $550,000 $550,000 $550,000 $550,000 $550,000 $2,750,000
VRF $1,100,000 - 0 - - 0 - - 0 - - 0 - - 0 - $1,100,000

 

 

 

 

 

 

Street resurfacing 01
Street resurfacing 02
Street resurfacing 03